Industries · Manufacturing & light industrial

Tax credits for plants, foundries, and warehouses.

You qualify for R&D credit even without a white-coat lab — if you iterate on tooling, process, or product. Stack federal and state R&D, energy ITC bonuses, apprenticeship, and the obvious hiring credits underneath.

WOTCR&D FederalR&D StateEZApprenticeship

Who this is for

Plants, foundries, machine shops, food processing facilities, and light-industrial warehouses. R&D applies to process iteration as much as product invention; energy retrofits qualify under the IRA.

  • ✓Plants and process manufacturers (food, beverage, chemicals)
  • ✓Discrete manufacturers (parts, equipment, tooling)
  • ✓Light-industrial warehouses and distribution centers
  • ✓Foundries, mills, and metal-fabrication shops

Get a credit assessment

See what the manufacturing & light industrial credit stack is worth for your locations.

We reply within one business day. No spam, ever.

Programs we file

The capture stack for manufacturing & light industrial.

The programs we routinely file for operators in this category. Per-credit value is a working range — your actual capture depends on hiring volume and jurisdictions.

RDF

R&D Federal

Process iteration and product development qualify — not just lab science.

6–8% of QREs
RDS

R&D State

State-level R&D credits in 38 states stack on the federal credit.

Var · 38 states
PB

Payroll Offset (R&D)

For young companies, R&D can be applied against payroll tax instead of income tax.

Up to $500K / yr
WOTC

Work Opportunity

Hiring credit on qualified Target Group employees — meaningful in higher-turnover plants.

$2,400–$9,600 / hire
APP

Apprenticeship

Apprentice hour credits and stackable wage bonuses for construction-side work.

Var · per state
ENR

Energy ITC

30% federal ITC on qualifying energy retrofits, plus IRA bonus multipliers.

30% ITC + bonuses

Where capture leaks

The problems we solve, specifically.

The problem

R&D Federal goes unfiled because operators assume they "don't do R&D."

What Trak does

Discovery interview surfaces the qualifying process and product work, then we substantiate it for filing.

The problem

State R&D programs vary widely and rarely get cross-mapped against federal claims.

What Trak does

Atlas runs state R&D eligibility against your facility footprint automatically.

The problem

Energy retrofit ITC + bonus credits are left on the table for retrofits already underway.

What Trak does

Pre-filing energy substantiation for ITC + prevailing-wage and domestic-content bonuses.

How it lands

Week 1 to first capture.

01

Week 1

R&D discovery interview

A 90-minute structured interview with engineering and operations leads to surface qualifying process and product work. Atlas-ingested cost data follows.

02

Weeks 2–3

Federal + state R&D scope

Qualified research expenses (QREs) substantiated against payroll, supplies, and contract research. State R&D eligibility mapped against the facility footprint.

03

Weeks 3–4

Energy + apprenticeship

Energy retrofit projects scoped for ITC + IRA bonus multipliers (PW, domestic content, energy community). Apprenticeship hour and ratio capture goes live across crews.

04

Months 2–6

Filing + workpapers

Federal + state R&D filed (or amended for open years); energy ITC substantiation ships; quarterly captures continue across WOTC, apprenticeship, and state programs.

Industry-specific failure modes

If any of these look familiar…

01

Operator says "we don't do R&D"

Process iteration, tooling design, new-material testing, and production-line optimization all qualify under the federal R&D credit. The discovery interview is built to surface this.

02

Energy ITC claimed without bonus multipliers sequenced

PW, domestic content, and energy community bonuses can add up to 5× on the ITC. They require pre-construction sequencing — claimed after the fact, they're rarely defensible.

03

Payroll Offset (R&D) not run for young companies

Companies under 5 years old with under $5M in gross receipts can apply R&D credit against payroll tax — up to $500K/yr. Most operators don't know it exists.

04

State R&D filed only at the federal entity

State R&D requires per-state mapping; the federal substantiation doesn't translate automatically. 38 states have programs; coverage varies materially.

What we ship

Deliverables and integrations.

Deliverables

R&D substantiation packet

Qualifying activities mapped to QREs (payroll, supplies, contract research) with the substantiation narrative ready for filing.

State R&D eligibility report

Per-state R&D program eligibility mapped against your facility footprint, with the recoverable value per state per open year.

Energy ITC bonus sequencing

PW, domestic content, and energy community bonus eligibility analysis per project, with the pre-construction sequencing needed to qualify.

Apprenticeship hour ledger

Centralized apprentice-hour and ratio capture per project, with the eligibility math handled automatically.

Integrations

ERP

SAP, Oracle, NetSuite, Plex, IFS — for QRE substantiation against cost-center data.

Payroll

ADP, UKG, Paychex, Workday — for R&D payroll substantiation and WOTC screening.

MES / shop floor

Plex, Aegis, Rockwell — for process-iteration substantiation when production data is needed.

Project / estimating

Procore, Buildertrend, Sage 100 Contractor — for energy and apprenticeship project capture.

Payback math

R&D credit alone usually clears the platform fee.

For a 22-site manufacturer with $80–$200M in revenue, federal R&D credit alone typically delivers $250K–$1M of recovery in the first filing year. State R&D and energy ITC stack on top.

~$520K
Median annual recovery across the full stack
6–8%
Federal R&D credit on Qualified Research Expenses
5×
Prevailing-wage ITC multiplier on qualified energy work
10–20%
Pay-on-capture contingency, set in conversation

Illustrative ranges. Actual results depend on your workforce and circumstances.

Industry questions, answered.

We don't have a lab. Can we still claim R&D?

Yes. The federal R&D credit applies to process iteration as much as product invention — qualifying activities include tooling design, new-material testing, production-line optimization, and process control improvements. If you iterate on how you make things, you likely qualify.

How does the IRA bonus multiplier work on energy ITC?

The base 30% federal ITC can stack with three bonus multipliers — prevailing wage (5×), domestic content (10–20%), and energy community (10%). PW and DC require pre-construction sequencing. We file the substantiation alongside the project plan, not after the fact.

Is the Payroll Offset for R&D real?

Yes. For companies under 5 years old with under $5M in gross receipts, the R&D credit can be applied against payroll tax (up to $500K/year) instead of income tax. Useful for early-stage manufacturers in growth.

What audit risk does this carry?

R&D and energy credits both attract higher examination rates than WOTC. We file with workpapers that are built for examination from day one — substantiation narratives, cost ties, time-tracking, and engineering interviews documented and retained.

Browse other industries